Company

Company


Established in 1985, Complet Edil 3 is now an experienced company capable of every aspect of extraordinary and ordinary maintenance, conservation restoration and general internal and external building renovations, working professionally with modern equipment on projects including:
  • Energy Reduction (with a tax deduction of 55%)
  • Replacement of traditional and insulated external surfaces
  • Treatment, reclamation and disposal of asbestos
  • Supply and installation of photovoltaic systems;
  • Restoration and refinement of plastered facades
  • Restoration and protection of natural stone
  • Exterior 'coating'
  • Restoration of concrete surfaces
  • Exterior painting, coatings
  • etc ...
The company has achieved the following certifications:
  • SOA category OG1 ranking V
  • SOA category OS6 ranking II
  • SOA category OS7 ranking III
  • SOA category OS8 ranking II
  • ISO 9001: 2000agrafo
Complet Edil 3 consider craftsmanship of the utmost importance and is technically prepared to solve in a valid and rational manner every problem related to the regeneration of new and old buildings, choosing and using only proven superior quality materials, working with specialised technicians. We are up to date with the most advanced technologies.

Staff and equipment


Staff
Complet Edil 3's technical staff consists of:
  • 2 Technical Directors with thirty years of experience
  • 3 Geometers following the Shipyard Direction
  • 5 Accountants who follow all tax and accounting practices
  • 1 Quality Manager
  • 1 Management Engineer for Management Control
Our technical staff of more than 90 skilled artisans in the field of safety, in particular:
  • Firefighters
  • Emergency and First Aid Manager
  • Removing and Editing Fixed Shingles
Complet Edil 3 employs more than 90 artisan members in its workshops:
  • bricklayers
  • painters
  • decorators
  • posers
  • blacksmiths
  • carpenters
  • fabricators
  • electricians
  • hydraulic
  • tinsmiths
  • Sheathers
Staff undergo compulsory safety training:

Fire Responsible
Emergency and First Aid Managers
Assembly Engineers
Removal and modification of fixed scaffolds

Equipment
Complet Edil 3 relies on a fleet of equipment:

18 lifting car platforms (for a total of 11,000 sqm)
22,000 square feet of fixed scaffolding
15 vans
Numerous recent mining equipment (demolition, drills, concrete mixers, winches-MABER, etc.)

Safety and Reliability Specifications


Below we outline some of the features a company must have to be trusted as well as some of the mandatory requirements to comply with Legislative Decree 81/2008 on Security.

The Company must be able to demonstrate the total regularity of the security (D.Lgs. 81/2008) with presence:

  • RSPP (compliant with Law 81/2008). Complet Edil appointed Mr. Luciano Roberto Mazzon.
  • Worker Responsibility (compliant with Law 81/2008). Complet Edil 3 has nominated Geom. Alberto Queboli.
  • First Aid Responsibility (compliant with Law 81/2008 with specific obligation to be present on site during all work). Complet Edil 3 has nominated Ms. Monica Berti for her activities in the office as she has provided ALL of our craftsmen and provides them with regular attestations.
  • Responsible Fire Fighter and Evacuation (compliant with Law 81/2008 with specific obligation to be present on site during all work). Complet Edil 3 has appointed Ms. Monica Berti for her activities in the office as she has provided ALL of our craftsmen and provides them with regular attestations.
  • Our scaffolding, modification and dismantling staff are also trained for this job, as required by law.

The company must also be able to demonstrate that it has all the professional technical requirements referred to in Annex XVII to the Consolidated Version 81/2008, must provide a copy of the Unique Document of Contribution Regularity and copy of the entry to the Chamber of Commerce Industry and Crafts both In validity.

In the event of failure of any of these requirements, the Contractor or the Work Manager (if any) attributable to the Designer is liable in the event of accidents or simple checks, with particularly high amounts of fines applicable for each individual requirement not respected for each worker, With immediate suspension of the yard.

It is important for the Company to have a third-party insurance coverage against the total amount of the contract. Complet Edil 3 has insurance coverage of €. 5.000.000,00 for damage against things or people and €. 150,000.00 for thefts perpetrated through provisional works.

Also, some things that can help the Customer in choosing a company are:

  • Holding a SOA certificate (mandatory for public contracts) with a category attributable to the works that make up the highest percentage of the contract. Complet Edil 3 owns SOA certificate for category OG1 IV ranking for €. 2,582,284.00 "civil and industrial construction work" and SOA certified for OS8 category I for €. 258.228,00 "finishing of general works of a technical nature";
  • ISO Certification on Technical Management and Works Execution (This requirement in tenders means that minimum warranty claims, SOA certification, etc. may be half as required in the event of a failure to certify) . Complet Edil 3 has been ISO 9001 certified since 2004).
  • References to performing similar jobs (however attested by the SOA certificate). Complet Edil 3 offers a brochure to illustrate some of the work that has been done in the past, giving the address to allow the Customer to check the success of the works.
  • Possibility to issue a "post-mortem" Post-Warranty Policy for the work done. Complet Edil 3 collaborates with the major manufacturers of materials to ensure wherever possible (see the enclosed "Insurance Cover" leaflet) a suitable insurance cover for the work carried out.

Safety and Reliability Specifications


Below we outline some of the features a company must have to be trusted as well as some of the mandatory requirements to comply with Legislative Decree 81/2008 on Security.

The Company must be able to demonstrate the total regularity of the security (D.Lgs. 81/2008) with presence:

  • RSPP (compliant with Law 81/2008). Complet Edil appointed Mr. Luciano Roberto Mazzon.
  • Worker Responsibility (compliant with Law 81/2008). Complet Edil 3 has nominated Geom. Alberto Queboli.
  • First Aid Responsibility (compliant with Law 81/2008 with specific obligation to be present on site during all work). Complet Edil 3 has nominated Ms. Monica Berti for her activities in the office as she has provided ALL of our craftsmen and provides them with regular attestations.
  • Responsible Fire Fighter and Evacuation (compliant with Law 81/2008 with specific obligation to be present on site during all work). Complet Edil 3 has appointed Ms. Monica Berti for her activities in the office as she has provided ALL of our craftsmen and provides them with regular attestations.
  • Our scaffolding, modification and dismantling staff are also trained for this job, as required by law.

The company must also be able to demonstrate that it has all the professional technical requirements referred to in Annex XVII to the Consolidated Version 81/2008, must provide a copy of the Unique Document of Contribution Regularity and copy of the entry to the Chamber of Commerce Industry and Crafts both In validity.

In the event of failure of any of these requirements, the Contractor or the Work Manager (if any) attributable to the Designer is liable in the event of accidents or simple checks, with particularly high amounts of fines applicable for each individual requirement not respected for each worker, With immediate suspension of the yard.

It is important for the Company to have a third-party insurance coverage against the total amount of the contract. Complet Edil 3 has insurance coverage of €. 5.000.000,00 for damage against things or people and €. 150,000.00 for thefts perpetrated through provisional works.

Also, some things that can help the Customer in choosing a company are:

  • Holding a SOA certificate (mandatory for public contracts) with a category attributable to the works that make up the highest percentage of the contract. Complet Edil 3 owns SOA certificate for category OG1 IV ranking for €. 2,582,284.00 "civil and industrial construction work" and SOA certified for OS8 category I for €. 258.228,00 "finishing of general works of a technical nature";
  • ISO Certification on Technical Management and Works Execution (This requirement in tenders means that minimum warranty claims, SOA certification, etc. may be half as required in the event of a failure to certify) . Complet Edil 3 has been ISO 9001 certified since 2004).
  • References to performing similar jobs (however attested by the SOA certificate). Complet Edil 3 offers a brochure to illustrate some of the work that has been done in the past, giving the address to allow the Customer to check the success of the works.
  • Possibility to issue a "post-mortem" Post-Warranty Policy for the work done. Complet Edil 3 collaborates with the major manufacturers of materials to ensure wherever possible (see the enclosed "Insurance Cover" leaflet) a suitable insurance cover for the work carried out.

Guarantees on work


Guaranteed work
Complet Edil 3 Soc. Coop. It guarantees the work (according to specific criteria) under the law:

Works of Ripavimentazione terraces and backrests: 10 years.
In accordance with the regulations in force, with a guarantee of intervention and free maintenance in case of defects found on the pose used.

Works of Waterproofing and Maintenance of Covering: 10 Years.
In accordance with the regulations in force, with a guarantee of intervention and free maintenance in case of defects found on the pose used.

Decoration works with plaster, paint and varnish type products: according to Law.

Extensions of guarantees

Upon a specific request by the Client (made at the time of confirmation of the work and agreeing on specific terms between the parties), the warranty provided for by the Law may be extended to:

Works of "thermal insulation" in Coat: 10 years.
Through a post mortem policy issued directly by the manufacturer of the material used, with the quality check carried out on site following the certification obtained by Complet Edil 3 as an applicator

Surface consolidation works with "armed shaving": 7 years.
Through a post mortem policy issued directly by the manufacturer of the material used, with the quality check carried out on site following the certification obtained by Complet Edil 3 as an applicator

Maintenance and coloring works with "elastomeric product": 7 years.
Through a post mortem policy issued directly by the manufacturer of the material used, with the quality check carried out on site following the certification obtained by Complet Edil 3 as an applicator

Works of decorating facades with plastering: 5 years.
Through a post mortem policy issued directly by the manufacturer of the material used, with the quality check carried out on site following the certification obtained by Complet Edil 3 as an applicator

For a customized quote for a building renovation, write to info@completedil3.it

Share by: